Connecting the GPS Receiver to the terminal
Preconditions
Each GPS receiver which is connected to the terminal must fulfil the conditions in the table below. GPS receivers which can be purchased from Müller Elektronik fulfil these conditions.
Technical requirements for using the DGPS Receiver
During initial start-up it can take approx. 30 minutes until the GPS Receiver has reception. At subsequent start-ups it will only take approx. 1-2 minutes.
Procedure
- þ
- The GPS receiver is mounted on the roof of the tractor.
- þ
- You have activated a suitable driver.
- 2.
- Guide the connection cable from the GPS receiver into the cab.
- 3.
- CAUTION! Ensure that the cable is not laid across sharp edges or at risk of becoming bent. Lay the cable in a place where nobody can trip over it.
- 4.
- Connect the connecting cable of the GPS receiver to port C on the terminal.




- Switch off the terminal.